The HOA construction crew began working on refurbishing
our upstairs deck on Monday, 8/26.
First, they removed the railings. They left the upright posts in place
and stored the railings in the flowerbed below our unit's deck.
Next, they removed all of the original deck floorboards and lateral supports.
After getting the deck cleared down to the original waterproof layer,
they added a new layer of rubberized waterproofing over the older material,
and they installed new aluminum flashing and sealed all the edges.
Then, the new pressure-treated wood floorboards were installed.
Finally, the original railings were put back in place.
The entire job was completed in two days
and the deck looks better than it did when the place was brand new.